1
Topics (SLA: 168h)
  • Write a working title, hook, and outline for the video
  • Add to filming queue in brain with target film date
  • Tag project with topic category and intended audience
outline reviewed and approved by Akash
2
Need to Film (SLA: 168h)
  • Block 30-minute filming slot on Akash's calendar (Mon or Thu preferred)
  • Confirm setup checklist is ready:
  • Camera and lighting operational
  • Script or outline printed / on screen
  • Background clean, audio tested
  • Notify Akash 24h before filming slot
footage captured and uploaded to Drive
3
Content in Progress (SLA: 168h)
  • Assign editor and share raw footage link
  • Brief editor on:
  • Hook — must land within first 30 seconds
  • Style guide (cuts, music, lower thirds)
  • Target length
  • Editor logs 50% checkpoint update in brain
first cut delivered to review folder
4
Quality Control (SLA: 48h)
  • Akash reviews first cut against checklist:
  • Hook lands within 30 seconds
  • No dead air longer than 2 seconds
  • Audio levels consistent
  • Correct branding (logo, colors, outro)
  • Approve or log specific revision notes with timestamps
Akash approves — stage moved to Ready for Publishing
Branch
Filming slot missed:
EA reschedules within 48h and updates target film date in brain. Flag if rescheduled twice — escalate to Akash.
5
Ready for Publishing (SLA: 48h)
  • Upload final video to YouTube (unlisted)
  • Fill in:
  • SEO-optimized title
  • Description with timestamps and CTA
  • Tags (minimum 10)
  • Custom thumbnail uploaded
video scheduled in YouTube Studio
6
Scheduled
  • Confirm publish date/time is locked in YouTube Studio
  • Draft community tab post for launch day — queue in EA's calendar
  • Prepare any associated Slack or email announcement
video goes live at scheduled time
Branch
Filming slot missed:
EA reschedules within 48h and updates target film date in brain. Flag if rescheduled twice — escalate to Akash.
7
Published
  • EA posts community tab announcement within 2h of publish
  • Share in #akash-notes Slack: video title + YouTube link
  • Log published date in brain project record
video is live and announced
8
Performance Review (SLA: 720h / 30 days post-publish)
  • Pull metrics: views, CTR, average watch time, 30-day retention
  • Compare against channel benchmarks
  • Flag top performers (see Offshoots for threshold)
  • Log insights in `brain.video_notes`: what worked, what to replicate, what to drop
insights logged in brain
Branch
Filming slot missed:
EA reschedules within 48h and updates target film date in brain. Flag if rescheduled twice — escalate to Akash.
9
Archived
  • Move project to Archived stage in brain
performance review complete — WIN terminal
Hands off to - **Top-performing videos** → Meta Ads Creative Pipeline (Not Started). Include: video link, top retention segment timestamps, hook text. - **Archived insights** → `brain.video_notes` serves as input to quarterly creative strategy review.